Land required for solar power plants

As the cost of photovoltaic solar power amounts away and the worth of concentrating solar power's storage improves, it's possible the cost of land could become a decisive element in a solar project’s total energy prices. A brand new land-use analysis demonstrates the selection of technology could be important.

Researchers at NREL received on acreage data from 72 per cent associated with the 6.7 gigawatts of operating and under-construction photovoltaic and focusing solar powered energy solar capability in 3Q 2012. The list of tasks surveyed include those from significant PV developers First Solar (FSLR) and SunPower (SPWR) and significant CSP designers BrightSource Energy, SolarReserve and Abengoa.

The investigation staff that produced the report utilized two land-use dimensions. The sum total location was taken as typically fenced offsite boundaries on plans. The direct-impact area had been smaller. It included just the land where there have been solar power arrays, accessibility roadways, substations, solution structures, and other infrastructure.

The essential efficient complete land use had been the 2.8 acres per gigawatt-hour annually connected with two-axis CPV installations greater than 20 megawatts. The smallest amount of efficient use of land ended up being the 5.5 acres per gigawatt-hour each year related to two-axis flat-panel PV tasks of less than 20 megawatts.

The absolute most efficient direct land use was the 1.5 acres per gigawatt-hour each year for meal Stirling CSP technology. The smallest amount of effective was, again, two-axis flat-panel PV tasks of less than 20 megawatts, with 4.1 acres per gigawatt-hour each year.

The caveat - which is important - is only 1 dish Stirling project, from Tessera Solar, had been analyzed. And only six CPV installments, including those from Tenaska and Cogentrix, were examined. Four for the CPV tasks were significantly less than 20 megawatts and just two were over 20 megawatts. Other appropriate conclusions inside analysis included:

  • Nine tower tasks analyzed for direct land usage arrived in at 2.8 acres per gigawatt-hour per year and seven parabolic trough CSP jobs used 2.5 acres per gigawatt-hour each year, both better than the 43 smaller fixed PV tasks’ 3.2 acres per gigawatt-hour each year therefore the 41 smaller single-axis 2.9 acres per gigawatt-hour per year.
  • Fourteen tower projects examined for total land usage arrived in at 3.2 acres per gigawatt-hour each year and eight parabolic trough projects utilized 3.9 miles per gigawatt-hour per year. The 52 smaller fixed PV projects used 4.4 miles per gigawatt-hour each year and 55 smaller single-axis PV projects utilized 3.8 acres per gigawatt-hour annually.

Larger PV jobs, though presently falling-out of benefit with utility-scale solar developers and financiers, showed enhanced direct and complete land usage.

  • Seven 20-megawatt-plus fixed and seven single-axis PV jobs had been examined. Fixed emerged in at 2.8 acres per gigawatt-hour each year in direct land use and single axis utilized 3.5 acres per gigawatt-hour per year.
  • Fourteen 20-megawatt-plus fixed PV projects utilized 3.7 miles per gigawatt-hour per year as a whole land and sixteen 20-megawatt-plus single-axis jobs utilized 3.3 miles per gigawatt-hour annually.

The worthiness of numbers and conclusions, the analysis recognized, was restricted to fairly tiny sample sizes, additionally the best quality information had not been constantly readily available for analysis. Frequently, the scientists could not get data from designers and were obligated to utilize 3rd party sources.

Also, over 26 gigawatts of utility-scale PV and CSP jobs had been in development in February 2013. “Owing into quick evolution of solar technologies, and land-use practices and regulations, ” the NREL study noted, “the results reported right here mirror previous performance and not always future styles.”

Source: www.greentechmedia.com
RELATED VIDEO
New Solar Power Plant Could Be Dangerous for Airplanes
New Solar Power Plant Could Be Dangerous for Airplanes
Land acquisition for Solar Power project at Gattu Mandal
Land acquisition for Solar Power project at Gattu Mandal ...
worlds biggest solar power plant opens at california
worlds biggest solar power plant opens at california
RELATED FACTS
Share this Post

Related posts

Average cost for solar power systems

Average cost for solar power systems

DECEMBER 12, 2017

We often get asked how much it would cost to install enough photovoltaic (PV) solar panels on a house or business building…

Read More
Battery Backup for solar power systems

Battery Backup for solar power systems

DECEMBER 12, 2017

In the case of utility grid outages All methods with this web page will continue to make use of the electrical energy produced…

Read More